Supply and Replacement of Compressor -Riviera Dreams

placeDubai calendar_month 

Supply and Replacement of Compressor -Riviera Dreams

Break Down Posted On: April 14, 2025 Closing On: April 27, 2025 Scope of Work – Overhauling & Recommissioning of 140HP Chiller CompressorSupply, Overhaul, and Recommissioning of 140HP Chiller Compressor

To fully restore the performance and reliability of a 140HP reciprocating compressor found with shorted stator windings through a complete overhaul process. The selected contractor will be responsible for all associated supply, repair, replacement, installation, testing and commissioning works, in compliance with international HVAC standards and UAE local authority requirements.

Scope of Work A. Site Preparation & Isolation

Ensure complete electrical and refrigerant isolation of the compressor unit before dismantling. Safely drain refrigerant (R-407) and compressor oil per Dubai Municipality environmental safety regulations.
 B.  Compressor Disassembly & Diagnostic Inspection Dismantle compressor at site or in workshop (if removal is required). Conduct internal inspection to determine:
Stator winding failure extent
Bearing wear
Valve plate and reed condition

Piston and ring integrity

Replacement of Components

Contractor must supply and install new or OEM-certified parts for the following:
Item DescriptionQtySpecification NotesStator Rewinding (140HP)1 No.Class F or better insulation, VPI processedMotor Protectors3 Nos.Thermally-rated motor protectors with reset functionalityPiston Ring Set (Full)1 SetAs per original cylinder dimensions – PTFE/Nylon or OEM alloy ring materialValve Reeds (Discharge & Suction)1 Set EachOEM-specified stainless steel bladesThrust Washer1 No.Hardened steel – OEM dimensionedBush Bearings1 SetBronze alloy/graphite-impregnated – dynamically balancedCompressor Gasket Set1 SetNitrile-based oil-resistant materials – for full reassemblyRefrigerant (R-407C)45 KgEnvironmentally compliant per ESMA standardsDrier Core Filters4 Nos.Compatible with liquid line filter-driers – Sporlan/Alco recommendedCompressor Oil – 4GS Grade6 GallonsShell Clavus or Suniso grade synthetic oilNitrogen Cylinders2 Nos.
  • High-purity grade for flushing and pressure testing

All components must be new, unused and traceable to recognized OEMs (Bitzer, Copeland, Carlyle, etc.) or certified equivalent suppliers approved for use in Dubai.

Rewinding Process (Stator)

Rewind stator windings using Class F/H insulation , copper windings and perform Vacuum Pressure Impregnation (VPI) . Conduct insulation resistance test and hi-pot test after rewinding. Balance motor rotor to ISO 1940 Grade G2.5 standards.

Reassembly, Charging & Testing;
Reassemble the compressor with all replaced parts using torque-calibrated tools .
Flush chiller circuit with dry nitrogen purge and vacuum test to <500 microns.

Charge system with R-407 refrigerant and 4GS oil to manufacturer-specified quantities.

Perform complete commissioning procedure including: Suction/discharge pressure check

Ampere load measurement
Superheat/subcooling calculation
Oil level stability test

Leak testing (Nitrogen 300 psi)

Deliverables & Reporting

Pre-Work Inspection Report : Detailing compressor condition, test results, and overhaul plan. Mid-Work Progress Report : Highlighting part replacements, stator rewinding evidence and reassembly procedures. Final Commissioning Report : Including photos, test results, refrigerant/oil charge logs, and validation of compressor operation.

Warranties

Minimum 12-month warranty from date of commissioning on: Rewound stator and electrical integrity Replaced mechanical components

Refrigerant and oil charge against contamination or leakage Any defect observed during warranty period must be rectified within 48 hours at no additional cost.

General Conditions

All work to comply with ASHRAE , AHRI , and Dubai Municipality/ESMA HVAC codes . The contractor must be registered with Trakhees or relevant Dubai authority for HVAC maintenance and refrigerant handling. No variations to quoted pricing will be accepted post work order issuance unless instructed and approved in writing by the client.

Project timeline and mobilization schedule must be submitted with the proposal.

NOTE TO VENDORSAs per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant authority in the Emirate of Dubai. Before you apply for any job in the Emirate of Dubai, please make sure to comply with regulatory requirements.

Failure to do so can result in stoppage of funds through Escrow Account. *HOAM bears no liability towards any payment that is withheld by the Escrow Operator.

  1. consider all risks, contingencies and other circumstances relating to the delivery of the Requirements and include adequate provision in its Proposal to manage such risks and contingencies. c. document in its Proposal all assumptions and qualifications made about the delivery of the Requirements, including any assumption that HOAM or a third party will deliver any aspect of the Requirements or incur any cost related to the delivery of the Requirements. 12. HOAM will convene an evaluation panel comprising members chosen for their relevant expertise and experience. In addition, HOAM may invite independent advisors to evaluate any Proposal, or any aspect of any Proposal. a. each Vendor’s understanding of the Requirements, capability to fully deliver the Requirements and willingness to meet the terms and conditions of the Proposed Contract 22. HOAM will advise Vendors if they have been shortlisted or not. Being shortlisted does not constitute acceptance by HOAM of the Vendor’s Proposal, or imply or create any obligation on HOAM to enter into negotiations with, or award a Contract for delivery of the Requirements to any shortlisted Vendor/s. At this stage in the RFP process HOAM will not make public the names of the shortlisted Vendors.
  1. All enquiries regarding the RFP must be directed to HOAM’s Point of Contact.
  2. Vendors must not directly or indirectly approach any representative of HOAM, or any other person, to solicit information concerning any aspect of the RFP.
  3. Only the Point of Contact, and any authorised person of HOAM, are authorised to communicate with Vendors regarding any aspect of the RFP. HOAM will not be bound by any statement made by any other person.
  4. HOAM may change the Point of Contact at any time. This notification may be posted on the system.
Where a Vendor has an existing contract with HOAM then business as usual communications, for the purpose of managing delivery of that contract, will continue using the usual contacts. Vendors must not use business as usual contacts to lobby HOAM, solicit information or discuss aspects of the RFP.
  1. Each Vendor must accept and adhere to the Conflict of Interest declaration in the Response Form and must immediately inform HOAM should a Conflict of Interest arise during the RFP process. A material Conflict of Interest may result in the Vendor being disqualified from participating further in the RFP.
  2. Vendors must not attempt to influence or provide any form of personal inducement, reward or benefit to any representative of HOAM in relation to the RFP.
  3. A Vendor who attempts to do anything prohibited may be disqualified from participating further in the RFP process.
  4. HOAM reserves the right to require additional declarations, or other evidence from a Vendor, or any other person, throughout the RFP process to ensure probity of the RFP process.
  5. Vendors must not engage in collusive, deceptive or improper conduct in the preparation of their Proposals or other submissions or in any discussions or negotiations with HOAM. Such behaviour will result in the Vendor being disqualified
placeDubai
Replacement of AC Compressors, Thermostats and Motors - La Riviera Estate Break Down Posted On: April 21, 2025 Closing On: April 26, 2025 1. Supply and replacement of AC Compressors - 6 nos.Make: Emerson Copeland Model Number: CR32K6M-PFZ-141...
placeDubai
Supply and install a refurbished replacement compressor matching the specifications of the original unit. Ensure mechanical compatibility and integration with the existing chiller system.   3.  3 System Flushing and Cleaning Perform a full system flush...
apartmentWoodplaceDubai
Job description / Role Employment: Full Time Job Description The safe and effective delivery of a portfolio of brownfield safety critical projects on multiple offshore platforms; including large production complexes (multiple platforms bridge...